Work zones & closures
I-80 construction tracker
Work zones and closures on I-80 in Nebraska, grouped by NDOT district from west to east. This page is an unofficial reader of Nebraska 511, not a live official NDOT feed — confirm every work zone on the official map before you drive.
- active work zones
- 12 active work zones · 3 of 5 district areas
- last checked
- Nov 28, 5:08 AM CST last checked · 5-min cache
All active work zones
12 events · west to east
Corridor map
Kimball · MM 22 → Omaha · MM 454
- Closure
- Incident
- Construction
- Conditions
- Notice
Unofficial 511 events placed by mile marker on a schematic map of Nebraska — not a live navigation map. Positions are approximate; verify with Nebraska 511 before you drive.
District 6 — West-central
Approx. miles 110–300 · Keith, Lincoln, Dawson, Buffalo
- ConstructionMile 221.3Nebraska DOT
I-80 westbound: Construction work.
Between Exit 231: Darr (6 miles west of the Lexington area) and MM 219 (near Cozad). Look out for construction work. Width limit 11'0" . Left lane closed in the westbound direction of travel.
- ConstructionMile 221.4Nebraska DOT
I-80 eastbound: Construction work.
Between MM 219 (near Cozad) and Exit 231: Darr (6 miles west of the Lexington area). Look out for construction work. Left lane closed in the eastbound direction of travel.
- ConstructionMile 221.4Nebraska DOT
I-80 in both directions: Long term road construction.
Between MM 219 (near Cozad) and Exit 231: Darr (6 miles west of the Lexington area). Look out for long term road construction work. A lane is closed intermittently. Width limit 11'0" . Speed limit 65 mph . Comment: Work includes new concrete pavement, grading, culverts, bridge replacement, bridge repair, and lighting.
- ConstructionMile 253.9Nebraska DOT
I-80 in both directions: Construction work.
Between MM 253 (16 miles east of the Lexington area) and MM 265 (6 miles west of the Kearney area). Look out for construction work. There are alternating lane closures.
- ConstructionMile 283.6Nebraska DOT
I-80 in both directions: Construction work.
Between MM 282 and Exit 291: Shelton (7 to 14 miles east of the Kearney area). Look out for construction work. The roadway is reduced to one lane. Until December 31, 2026 at about 6:00PM CST. Comment: Work includes crack sealing on I-80 and the Gibbon exit on and off ramps. Traffic will be maintained with lane closures. Anticipated completion is Dec. 31, 2026.
- ConstructionMile 285.3Nebraska DOT
I-80 eastbound: Construction work.
At Exit 285 ramp to NE 10C Link. Look out for construction work. A lane is closed intermittently. Until December 31, 2026 at about 6:00PM CST.
District 4 — Grand Island–York
Approx. miles 300–362 · Hall, Hamilton, York
- ConstructionMile 359.6Nebraska DOT
I-80 westbound: Construction work.
Between MM 362 and MM 358 (6 to 7 miles east of the York area). Look out for construction work. Width limit 14'0" . Right lane closed in the westbound direction of travel.
- ConstructionMile 360.2Nebraska DOT
I-80 westbound: Construction work.
At Exit 360 ramp to NE 93B Link. Look out for construction work.
District 1 — Seward–Lincoln–Cass
Approx. miles 362–440 · Seward, Lancaster, Cass
- ConstructionMile 381.9Nebraska DOT
I-80 in both directions: Long term road construction.
Between Exit 382: Milford (9 miles east of the Goehner area) and West "O" St Link (near Lincoln). Look out for long term road construction work. Expect changing traffic patterns. Width limit 12'0" . Speed limit 55 mph . Comment: Construction to widen I-80 to six lanes, reconstruct the Pleasant Dale Interchange ramps, as well as reconstruct the NW 126th, NW 112th, NW 98th and NW 84th street overhead bridges to span over I-80.
- ClosureMile 400.9Nebraska DOT
I-80 westbound: Road closed.
At Exit 401C ramp to I-180 SB. The road is closed because of construction work. See map for detour(s). From 12:00PM CST to 12:00AM CST on weekends.
- ClosureMile 401.0Nebraska DOT
I-80 eastbound: Road closed.
At Exit 401B ramp to I-180 NB. The road is closed. Bridge construction work is in progress. See map for detour(s). Comment: Eastbound I-80 traffic travelling to northbound I-180 will be detoured to the I-80 and Cornhusker Highway interchange (399) to travel eastbound on Cornhusker Highway and access 180 at the I-180 and Cornhusker Highway interchange.
- ConstructionMile 401.3Nebraska DOT
I-80 in both directions: Construction work.
Between I-180 and Exit 403: 27th Street; State Fair Park (Lincoln). Look out for construction work. Left lane closed in the eastbound direction of travel and right lane closed in the westbound direction of travel.
Read this before you drive
This page is an unofficial reader of Nebraska 511, not an official NDOT publication. It can lag, omit a new work zone, or change without notice. District mile ranges are approximate groupings, not official boundary claims. Long-term projects may appear only in NDOT's weekly Construction & Detour Report, not in 511. Confirm work zones, lane closures and detours with Nebraska 511 (or 511 by phone) and the NDOT weekly report (PDF). For an emergency on the interstate, use *55.