Skip to content
I-80 Nebraska
INTERSTATE80I-80 Things

Corridor status

I-80 road conditions & closures

A single check of Nebraska 511 events and National Weather Service alerts for the I-80 corridor, from Omaha to Kimball. Use this as a starting point, then confirm with the official map before you drive.

Open Nebraska 511Checked Nov 28, 5:26 AM CST · refreshes every 5 minutes while open
I-80 events
12 I-80 events · closures, work zones and incidents
NWS alerts
0 NWS alerts · corridor counties
statewide 511 events
616 statewide 511 events · includes events off I-80

Corridor map

Kimball · MM 22 → Omaha · MM 454

  • Closure
  • Incident
  • Construction
  • Conditions
  • Notice

Unofficial 511 events placed by mile marker on a schematic map of Nebraska — not a live navigation map. Positions are approximate; verify with Nebraska 511 before you drive.

Closures, crashes & work zones

Verify on 511
  • ClosureMile 400.9Nebraska DOT

    I-80 westbound: Road closed.

    At Exit 401C ramp to I-180 SB. The road is closed because of construction work. See map for detour(s). From 12:00PM CST to 12:00AM CST on weekends.

    Updated Sep 5, 1:05 PM CDTStarted Aug 26, 9:15 PM CDTOpen on 511
  • ClosureMile 401.0Nebraska DOT

    I-80 eastbound: Road closed.

    At Exit 401B ramp to I-180 NB. The road is closed. Bridge construction work is in progress. See map for detour(s). Comment: Eastbound I-80 traffic travelling to northbound I-180 will be detoured to the I-80 and Cornhusker Highway interchange (399) to travel eastbound on Cornhusker Highway and access 180 at the I-180 and Cornhusker Highway interchange.

    Updated Aug 31, 1:00 PM CDTStarted Aug 30, 9:21 AM CDTOpen on 511
  • ConstructionMile 401.3Nebraska DOT

    I-80 in both directions: Construction work.

    Between I-180 and Exit 403: 27th Street; State Fair Park (Lincoln). Look out for construction work. Left lane closed in the eastbound direction of travel and right lane closed in the westbound direction of travel.

    Updated Nov 25, 9:19 AM CSTStarted Sep 22, 10:54 AM CDTOpen on 511
  • ConstructionMile 221.3Nebraska DOT

    I-80 westbound: Construction work.

    Between Exit 231: Darr (6 miles west of the Lexington area) and MM 219 (near Cozad). Look out for construction work. Width limit 11'0" . Left lane closed in the westbound direction of travel.

    Updated Nov 20, 8:40 AM CSTStarted Mar 25, 12:00 PM CDTOpen on 511
  • ConstructionMile 381.9Nebraska DOT

    I-80 in both directions: Long term road construction.

    Between Exit 382: Milford (9 miles east of the Goehner area) and West "O" St Link (near Lincoln). Look out for long term road construction work. Expect changing traffic patterns. Width limit 12'0" . Speed limit 55 mph . Comment: Construction to widen I-80 to six lanes, reconstruct the Pleasant Dale Interchange ramps, as well as reconstruct the NW 126th, NW 112th, NW 98th and NW 84th street overhead bridges to span over I-80.

    Updated Nov 19, 7:55 PM CSTStarted Apr 2, 7:10 AM CDTOpen on 511
  • ConstructionMile 221.4Nebraska DOT

    I-80 eastbound: Construction work.

    Between MM 219 (near Cozad) and Exit 231: Darr (6 miles west of the Lexington area). Look out for construction work. Left lane closed in the eastbound direction of travel.

    Updated Nov 19, 4:48 PM CSTStarted Mar 25, 12:00 PM CDTOpen on 511
  • ConstructionMile 359.6Nebraska DOT

    I-80 westbound: Construction work.

    Between MM 362 and MM 358 (6 to 7 miles east of the York area). Look out for construction work. Width limit 14'0" . Right lane closed in the westbound direction of travel.

    Updated Nov 19, 2:52 PM CSTStarted Nov 16, 9:03 AM CSTOpen on 511
  • ConstructionMile 253.9Nebraska DOT

    I-80 in both directions: Construction work.

    Between MM 253 (16 miles east of the Lexington area) and MM 265 (6 miles west of the Kearney area). Look out for construction work. There are alternating lane closures.

    Updated Nov 18, 11:31 AM CSTStarted Jul 13, 2:09 PM CDTOpen on 511
  • ConstructionMile 221.4Nebraska DOT

    I-80 in both directions: Long term road construction.

    Between MM 219 (near Cozad) and Exit 231: Darr (6 miles west of the Lexington area). Look out for long term road construction work. A lane is closed intermittently. Width limit 11'0" . Speed limit 65 mph . Comment: Work includes new concrete pavement, grading, culverts, bridge replacement, bridge repair, and lighting.

    Updated Nov 17, 9:35 AM CSTStarted Mar 30, 5:46 PM CDTOpen on 511
  • ConstructionMile 360.2Nebraska DOT

    I-80 westbound: Construction work.

    At Exit 360 ramp to NE 93B Link. Look out for construction work.

    Updated Nov 16, 9:06 AM CSTStarted Nov 16, 8:51 AM CSTOpen on 511
  • ConstructionMile 283.6Nebraska DOT

    I-80 in both directions: Construction work.

    Between MM 282 and Exit 291: Shelton (7 to 14 miles east of the Kearney area). Look out for construction work. The roadway is reduced to one lane. Until December 31, 2026 at about 6:00PM CST. Comment: Work includes crack sealing on I-80 and the Gibbon exit on and off ramps. Traffic will be maintained with lane closures. Anticipated completion is Dec. 31, 2026.

    Updated Nov 13, 1:57 PM CSTStarted Nov 16, 7:00 AM CSTOpen on 511
  • ConstructionMile 285.3Nebraska DOT

    I-80 eastbound: Construction work.

    At Exit 285 ramp to NE 10C Link. Look out for construction work. A lane is closed intermittently. Until December 31, 2026 at about 6:00PM CST.

    Updated Nov 13, 1:51 PM CSTStarted Nov 16, 7:00 AM CSTOpen on 511

Weather alerts

No active National Weather Service alerts for the corridor towns right now. Conditions can change quickly, especially in winter.

Read this before you drive

The 511 layer behind this page is an unofficial reader of the same map the state uses. It can lag, omit a new incident or change without notice. Closures and crashes are confirmed only when NDOT, Nebraska 511 or the State Patrol says so. For winter travel, check the forecast and the official map together.